6.) Setup warning system and slow control variables to monitor for the magnet and vacuum
7.) Configuring all magnet and vacuum cabling and monitoring to cryo-platform
Carlos
1.) Finalize sensors and readouts for fridge and magnet (specifically outside magnet)
...
4.) Leak check risers and vacuum space (or start whatever admin process we need to)
5.) Configuring all fridge and cryo cabling and monitoring to cryo-platform
Anchit
1.) Make NH3 and ND3 try to optimize procedure
...