2.) Microwave frequency calibration and reliability tests

3.) NMR (UVA system) and Microwave PS long cable length setup and tests

4.) Know all details of controlling VI, simulations and automation

45.) CPI power supply communication and remote controls VI and testing

56.) Microwave All microwave cabling and safety interlock setup and write-ups for FNAL electrical walk through

76.) Nitrogen Shield vessel Engineering Note

...

2.) Completion of Quench simulations and write up

3.) VI (Must be LabView) for vacuum pressure (more important) and turbo controller (less imporant)

...

6.) Setup warning system and slow control variables to monitor for the magnet and vacuum

7.) Configuring all magnet and vacuum cabling and monitoring to cryo-platform

Carlos

1.) Finalize sensors and readouts for fridge and magnet (specifically outside magnet)

2.) Actuator Controls controls and limit switches and positioning 

...

4.) Leak check risers and vacuum space (or start whatever admin process we need to)

5.) Configuring all fridge and cryo cabling and monitoring to cryo-platform

Anchit

1.) Make NH3 and ND3 try to optimize procedure 

...

2.) Produce the SpinQuest dynamic dilution factor using MCFM considering all materials

3.) Study variation of dilution factor experiment Q2, qT and Xb

Liliet

1.) Analysis