FocusTaskResponsible personStatusNotes
Slow Controls Rack

Finalizing the overall rack ORC
Having extra cables installed



Zulkaida, could you please metion the link to your list presented on ?

Magnet Rack
  • Finalizing the overall rack ORC to operate
  • Checking level probes with LHe Dewars on cryoplatform



In-cave piping
  • Pressure test for helium manifold
  • Installing insulation for LN2 supply line
  • Installing remaining gHe hoses
  • Installing two relief valves (gHe safety, gN vent)



Fridge



NMR



Thermocouples



Other sensors











---------------------------------- below → Previous tasks list (will be deleted)----------------------------------------------

...