CategoryTaskPerson/ProgressNote
Magnet PS

We should get the information of Clamped/Reate-Limit/Quench from the Mercury-iPS to the VI.

KenichiMagnet PS

We need a power-indicator on the shim power supply. These are the shim-coil-power indicators.

Completed:HarshaKenichiNot testedFirst design a proper hardware setup.
Magnet PS

We need a field indicator in the cave.

Anyone?First design a proper hardware setup.
GV bypassNeed to figure out a way to fill and keep filling with the nose level over the lower heat exchanger chip resistor during DNP production mode.  We need the main flow to be around 20 slm during this mode and then only way that will work is if the place where the LHe is coming from is under liquid.

Fridge valveWhen the run valve is PIDing we need it to open gradually to keep the level so that the flow doesn't go too high.  For bypass this is not important but for run valve we want to keep the main flow low but replenish the liquid level.  Right now, this PID is making the flow shoot up and down is cycles with very high flow.Kenichi
GV bypassThe gv-bypass opens too much to get too high of flow when PIDing in pressure.  It seems to open and closing a lot at large amplitude.  We want this to be much more gradual and try to be conservative on delivering to much flow in spikes.  The stability of the PID needs to be improved.  Also, for manual control the precision of software control doesn't match the minimal step size, we should update that.Kenichi
PDPMake auto switching through each NMR channel.
90%Add switching parameters.
PDPRemove unused parts of the VI.

PDPPDPAdd calculators for TECompletedImplemented in data summary page.Add calculators for t1.KenichiNot PDP but data summary page?
AlarmWe also need either a webpage or a script that says what to do in case of each of these alarms.
Make a trouble-shooting page.
PDPOnce we have the UVA PDP made to our needs we need to do that same type thing for the LANL system so we can use it.

New VIMake a set of VIs for RF modulator, R&H xyz.
Farooq/Dustin
New VIMake a set of VIs for RF modulator, Agilent xyz.
Farooq/Dustin
Heat tapeTest the RS-485 communication with the power controller (Fuji Electric PXF4).  Create a VI(s) to read the present status and change the set point.
Chatura
New VIMake a set of VIs for Pfeiffer Vacuum OmniControl 200.
Farooq/Kenichi

Recently Completed Tasks

CategoryTaskPersonNote
PDPAdd calculators for TECompletedImplemented in data summary page.
Magnet PS

We need a power-indicator on the shim power supply. These are the shim-coil-power indicators.

Completed.
Magnet PS

Need to be able to ramp-down 0A with 0.5A/m rate, so there should be a preset for that.

Completed.
Magnet PS

Need a manual override in the VI.

Completed.
PDPImport the readings of He4 & He3 pressures from CCP.
Completed.Over TCP/IP.
AlarmWe need a target alarm handler that allows us to turn on or off alarms from some main GUI.  We should be able to silence and initiate whatever alarms we want at any given time based on what is going on. 
Completed.There is a configuration webpage since Aug. 2023.
GV bypassAdd to pid on 1000/fridge pressure too.Completed.The 1000 sensor is used when the pressure is >100 Torr.

...