Critical Path Items


TaskStatusNotes
Setting up zoom meetings in the Hall 

Setting up a leak checker station (in the hall in the loading dock area)

Setting up a leak checker station (in the counting-house)

Putting all turbo and vacuum piping together with backing pump

Pressure test on the shell

Setup thermocouple readout (T-type sensors)

Install cable trays and complete the connection with the magnet rack

Complete all the connections in the magnet rack

Testing each device on Magnet rack

Find out (order a long) the cable to test baratrons 

Purchase additional He Flow Control

Need to figure out a long cable for the He level probe (for the fridge)

Setup in-cave He flux tube

Setup in-cave N2 flux tube

Setup He riser connections

Setup N2 riser connections



*Non-critical Path Items


LocationTaskStatusNotes
Counting-house work area

Find all large boxes that need to be going to the storage and arrange those to be moving to storage 

(the boxes that will be used frequently can be stored on top of those cupboards, other rest of all boxes can be disposed)




Find items that can be shipped to UVA


Collect all unwanted items in each cupboard and move them to different location/storage/throw


Assign designated locations in those cupboards to store cables/parts/items relevant to the systems

(eg: Microwave related, Actuator related, Magnet rack related, etc.)

Once this is organized, there will be dedicated web page in this wiki to keep inventory list with pictures (then anyone can find anything easily)




Arrange all the tables for anyone to work at any time (there shouldn't be cables/parts/screws/items etc on these tables

because those should be in their designated place)




Purchase a wise and set it up on a table


Prepare the second target stick (as same as the one is hanging on the fridge-frame)


Find all fittings, bolts, etc. (eg: water fitting..) stuff that we don't need, and keep those somewhere else. 

Organize "Swadgelocks, NPT, stuff that have KF flange" in those yellow boxes




Label all cables (using the stickers with the relevant system) and identify the cables that need to be shipped to UVA


Prepare dedicated toolboxes for NMR, Microwave, Cryogenics (there three small table-top tool boxes)

Hall - Loading dock areaCheck/open all the boxes (including wooden ones) and identify which of those should go to storage and arrange moving


Clean-up loading dock area (move all pipes, boxes, items etc. to proper places to store)


Move the vacuum pump to the downstairs (right below the loading dock : area next to the beam dump in the down stream)


Check whether that black tool box's lower part can be used for the leak-cheker's lower part (which has wheels), 

and the upper part can be used as Target Tool box in the work area next to the beam dump (where the target cups are refilled)



Hall - Cryorack Identify and label all cables that need to be connected to all devices on cryo rack (slow controls rack)

Hall - Roots pumps (on cryo platform)Move scroll pump (right now it is close to NM3 enclosure / upstream beamline area) to here


Design and make a small rack to hold all Vacuum pumps (scroll pump and other two pumps that are currently sitting on the platform base)


Setup a He bottle in the corner near the roots pumps


Setup the control patch panel for roots pumps in the cave

Hall - NM3/3 enclosure area (including the area under the beamline)Clean up the area


Organize the cart that is sitting in that area only with the KF parts and other essential parts: all tools should be kept in the relevant tool box(s)

Hall - TurbopumpMove the Pfeifer Vacuum (ACP) device to here and set it up 


Setup with proper flangers


Calibrate manometer and set it up in the small space close to the west penetration