Here we organize the Operational Readiness Clearance (ORC) documents that needed to be submitted. Please "Click" on the title(s) to navigate to the dedicated page(s).
Target computer shutdown procedure: https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=7683
FNAL ORC Submission page: https://fermipoint.fnal.gov/service/tsworc/SitePages/Home.aspx
System | ORC # | Description |
---|---|---|
Target Lifter | ORC-1837 | Lifter assembly |
Target Lifter | ORC-1865 | Lifter control system |
Target Lifter | ORC-1866 | Lifter ADC system |
Target Lifter | ORC-1877 | Lifter Monitoring system |
Microwave | ORC-1934 | Microwave motor controlling box |
Slow control rack | ORC-1895 | Overall rack ORC |
ORC-1969 | E1039 Slow Control Rack Update in NM4 Hall | |
UVA-NMR | ORC-1854 | Custom components |
UVA-NMR | ORC-1888 | Commercial Components |
UVA-NMR | ORC-1888.01 | Addendum for operating from the cryo platform |