Do Immediately | Additional Information | Task Finished Result |
---|---|---|
Fridge sensors | 1KOhm Ruthenium Oxide | |
Preparation for the dock survey | setup tooling table and position magnet and detail survey layout with crew | http://dbweb5.fnal.gov:8080/ECL/spin_quest/E/show?e=359 |
Determine and measure true path for all cables coming from target cave and order all cable needed | Front Penetration → Racks on Cryo platform → Counting House Side Penetration → Racks on Cryo platform → Counting House | |
Replace Black BUNA-N O-rings | Measure existing O-rings and find PTFE (Teflon) equivalents
| |
After replacing seals setup safety walk through with | Setup Operational Readiness Clearance (through Rick) | |
Buy a flaring tool for copper tubing | ||
Assemble and test microwave system | Needs to be shipped from UVa - 7/17/19 Borrow gore cable from UVa Need waveguide too | |
Get Liverpool NMR Q-meter (and ancillary equipment) from LANL | ||
Setup temp full microwave system for testing here | ||
Setup sensors on stick | Check with lakeshore | |
Stink test in the target loading area | with "special" spray | |
Setup and test manometer | ||
Setup external magnet sensors with data going into slow controls data stream | ||
Shim Microwave actuator bushings for hard stop and top target. Microwave table and magnet should be in place and use the information from initial survey to measure | ||
Setup LANL NMR system for testing in counting house target area | ||
Setup UVA NMR system for testing in counting house target area |
...