The Confluence production environment will undergo a migration from 8am-5pm ET on Saturday, May 25th. The Confluence environment will be available in read only mode. Changes to data in Confluence will not be possible until the migration is complete.
...
Polarized Target Monitoring and Maintenance Guide https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=10182
How to connect to the Cryo-Control / QT Computer remotely?
Target_Maintenance_Guide_Revised_02-26-2023.pdf
How to request NM4 (EXP27) and Building 327 (A5BB2) key
Supplies Catalogue: Inventory list (at Counting room) [Supplies Catalog]
...
*** Set of Procedures on docdb and HAs (click)
Fermilab Access & Trainings
- Pictures at NM4
UVA-NMR System at NM4
Target Lifter at NM4
Microwave System at NM4
Helium Liquefier (QT) System at NM4
- Insulation Vacuum Chamber (IVC)
Cooldown Phase 2023
- Magnet Rack
Magnet Power Supply System at NM4
Magnet Shim Power Supply
Roots-Pumps System at NM4
- Fridge Sensors
Fridge Valve Control System at NM4
- Target Insert
- Target Materials Related Information
- Monitoring Layout in Control Room
Target Computer setup at NM4
Slow Controls
- Annealing System
- Gate Valve
Inventory list (at NM4 and UVA)
- IP addresses
- Sample HA :
View file name HA-QT-Coldheads.docx height 150 - Data Logs
- Polarized Target Maintenance & Monitoring Activities
- LN2 lines
Purchasing Information (by the SpinQuest Collaboration) (< Click)