Here we organize the Operational Readiness Clearance (ORC) documents that needed to be submitted. Please "Click" on the title(s) to navigate to the dedicated page(s).


Target computer shutdown procedure: https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=7683 


FNAL ORC Submission pagehttps://fermipoint.fnal.gov/service/tsworc/SitePages/Home.aspx 


System
ORC #Description
Target Lifter
ORC-1837Lifter assembly


ORC-1837.01E1039 Target Lifter Addendum (re-installation)


ORC-1865Lifter control system


ORC-1866Lifter ADC system


ORC-1877Lifter Monitoring system
Microwave
ORC-1934Microwave motor controlling box 
Slow control rack
ORC-1895Overall rack ORC


ORC-1969E1039 Slow Control Rack Update in NM4 Hall
UVA-NMR
ORC-1854Custom components
UVA-NMR
ORC-1888Commercial Components
UVA-NMR
ORC-1888.01Addendum for operating from the cryo platform
Magnet Electronics (in-cave
ORC-2049Covers all the electronic connections on the magnet (in-cave)
Fridge Electronics
ORC-2050ORC2050_Fridge_Electronics.pdf
Magnet cooldown
ORC-2056
Polarized Target Final Walkthrough
ORC-2055
Magnet
ORC-2171

Heat Tapes for Target Cryogenic System at SpinQuest

Outside gHe tank
ORC-2199

Pressure and Temperature Sensors for Outside Gaseous Helium Tank at SpinQuest

QT compressor
ORC-2205

Temperature Sensors for LCW Outlet of QT Compressor at SpinQuest

Click Updates Page to see some updates on scheduling, constructions etc.

                     Manuals & Sample docs:

...

8) Cryo-rack ORC (Zulkaida & Ernesto)


9) Magnet -rack ORC ORC (rack and in-cave) (Zulkaida)


10) Slow-Controls Rack ORC (Zulkaida)