Helium Liquefier (QT) System

Task#TaskFrequencyComments
1Check the gHe bottles' level on west-wall of the cryoplatformMonday/Wednesday/Friday
2Record the number of gHe and gN2 bottles at the outside rackMonday/Wednesday/Fridayhttps://docs.google.com/spreadsheets/d/1EDTHSeUDGJ9b6beYizHEAJ8-Z1rAiQbZMgKhmloPLw8/edit#gid=1831993347
3Check gHe pressure and LN2 pressure of the outside tanksEvery morning, eveninghttps://docs.google.com/spreadsheets/d/1EDTHSeUDGJ9b6beYizHEAJ8-Z1rAiQbZMgKhmloPLw8/edit#gid=1940801906
4Check QT HR3 gaugesEvery morning, eveninghttps://docs.google.com/spreadsheets/d/1EDTHSeUDGJ9b6beYizHEAJ8-Z1rAiQbZMgKhmloPLw8/edit#gid=1940801906
5Check QT liquid (Dewar/purifier) levelsEvery morning, eveninghttps://docs.google.com/spreadsheets/d/1EDTHSeUDGJ9b6beYizHEAJ8-Z1rAiQbZMgKhmloPLw8/edit#gid=1727227200
6Check LCW main inlet, an outlet to NM4Every morning, eveninghttps://docs.google.com/spreadsheets/d/1EDTHSeUDGJ9b6beYizHEAJ8-Z1rAiQbZMgKhmloPLw8/edit#gid=558588447
7Monitoring QT compressor LCW temperaturesEvery morning, evening(setting up this is still in progress)
Alarm conditions: T_inlet > 95F or T_out > 115F
8Filling LN2 to the QT purifier using portable DewarMonday, Wednesday, FridayMark the date, time, levels before and after filling
Procedure: Filling LN2 on Purifier Dewar
** Need to be qualified with large portable liquified gas dewar handling training (FN000475 / OJ) **
9Filling gHe outside tanks using tube-trailerOne every 3 monthsInstructions will be added soon

Roots Pumps system

Task#TaskFrequencyComments
1Check oil levels of all 4 pumpsOnce everydayRequired levels:
  • when pumps are not running: Close to Full
  • when pumps are running: close to center/mid level
2Check LCW inlet, and outlet parameters to the ROOTSEvery morning, eveninghttps://docs.google.com/spreadsheets/d/1EDTHSeUDGJ9b6beYizHEAJ8-Z1rAiQbZMgKhmloPLw8/edit#gid=0
3Check ROOTS pumps pressure and temperature using HMIEvery morning, eveninghttps://docs.google.com/spreadsheets/d/1EDTHSeUDGJ9b6beYizHEAJ8-Z1rAiQbZMgKhmloPLw8/edit#gid=761047776

UVA-NMR system

Task#TaskFrequencyComments
1Check Lambda/2 cable connectivityOnce a weekIf a cable has a problem, then mark it with a label
2







Magnet Power Supply system


Target Lifter system


Cryogenic system checks (Pressure & Temperature)