All Coordinator position are for 1 year unless worked out with the Chair and Service Coordinator. One can volunteer for any open service work or position, all are offered on a first come first serve basis. If conflict arise the Chair may call an election or form a selection committee at anytime.
Collaboration Coordinators
Collaboration Chair - D. Keller
Analysis Coordinator
Talk Coordinator
Service Coordinator
Shift Coordinator
Click here for details...
The Shift Coordinator (ShC) is responsible for maintaining the shift schedule. The ShC should use the online Fermilab ECL system to maintain the schedule and arrange for a fixed shift a least one month ahead of time. In the case of cancellations the ShC is responsible for finding replacements to cover the shifts and reporting any changes to the RC. The ShC is also responsible for making sure that the people on the schedule are qualified to take the shift. This means they should have taken the experiment shift training as well as the FNAL training needed. The Shift Coordinator is also responsible for making and up-keeping the experiment training materials for the Collaboration. The ShC is responsible for coordinating shift trades and getting shift reminders to members about upcoming shifts.
Run Coordinator Two people at a time to alternate off and on with position lasting as long the run (1 commissioning run (three months), 2 production runs (1 year))
Click here for details...
The Run Coordinator (RC) will be responsible for supervising the running of the experiment on-site at FNAL. This person will chair daily meetings to review the immediate progress and challenges of the experiment, will remind shift-takers of their duties and make sure optimal run conditions are being implemented. The RC is responsible for keeping the shift-takes updated on any configuration changes or changes to the run plan. The RC will keep a web-page with all the information from the daily meeting as well as expected run conditions, conditions for the beam and target, and monitoring. The RC must check the results of the online monitoring and continue to try to optimize the running conditions. The RC is responsible for checking the list of subsystems experts (provided by SyC) and contact info. Near on-site experts must be available at all times and the RC is responsible for making sure qualified experts are scheduled during all running times.
Outreach Coordinator
Systems Coordinator
Physics Coordinator
Work Coordinator
Working Group Leaders will be responsible for leading the effort for particular physics analyses as well as
well as hardware specialty. These working group leaders are responsible for movement within the working groups
and staffing the experiment with the expertise needed while running. Each physics-working group leader can focus
its analysis in whatever way fitting for that physics scope but must offer a dedicated effort to the Sea Quark
Sivers extraction. The physics working groups can decide the order of graduate students of that groups dedicated
physics publications.
Physics Working Group Leaders
Sea Quark Sivers -
J/psi TSSA -
Open Charm and anti-charm -
Transversity -
Heavy Photon, Dark Higgs -
Instrumentation Working Group Leaders
(Critical) Requires an on-site presence commitment
These positions are full time (FTE) during commissioning (40 hrs/week) until the system is
operational and on-call (24x7) thereafter. Minimum term of responsibility is one year provided a
suitable trainee is identified to pick up the system after the first year.
(Need to fix complex problems quickly while running)
Target - D. Keller
Chambers -
C. Chamber -
Hodoscope* -
Proportional Tube* -
Cherenkov -
DAQ -
Trigger -
Online Monitoring* -
Slow Controls -
L3 Trigger* -
(General)
Simulations -
Systematics -
Data Management -
Service Tasks
light cleaning and organization
beamline work
detector electronics
shielding work
piping and assembly
writing documentation: Online and printable documents, editing, safety checks
Need people to train to be next generation experts: Drift Chambers, DAQ, Trigger, ...(students, postdoc for every station)
Institutional Purchase