* Critical Path Items
Task | Status | Notes |
---|
Setting up zoom meetings in the Hall |
|
|
Setting up a leak checker station (in the hall) |
|
|
Setting up a leak checker station (in the counting-house) |
|
|
Putting all turbo and vacuum piping together with backing pump |
|
|
Pressure test on the shell |
|
|
Setup thermocouple readout (T-type sensors) |
|
|
Install cable trays and complete the connection with the magnet rack |
|
|
Complete all the connections in the magnet rack |
|
|
Testing each device on Magnet rack |
|
|
Find out (order a long) the cable to test baratrons |
|
|
Purchase additional He Flow Control |
|
|
Need to figure out a long cable for the He level probe (for the fridge) |
|
|
Setup in-cave He flux tube |
|
|
Setup in-cave N2 flux tube |
|
|
Setup He riser connections |
|
|
Setup N2 riser connections |
|
|
Non-critical Path Items