Critical Path Items


TaskStatusNotes
Setting up zoom meetings in the Hall 

Setting up a leak checker station (in the hall)

Setting up a leak checker station (in the counting-house)

Putting all turbo and vacuum piping together with backing pump

Pressure test on the shell

Setup thermocouple readout (T-type sensors)

Install cable trays and complete the connection with the magnet rack

Complete all the connections in the magnet rack

Testing each device on Magnet rack

Find out (order a long) the cable to test baratrons 

Purchase additional He Flow Control

Need to figure out a long cable for the He level probe (for the fridge)

Setup in-cave He flux tube

Setup in-cave N2 flux tube

Setup He riser connections

Setup N2 riser connections