o Connect roots pumps to H20
  + P&ID for roots water system
  + P&ID for roots vacuum system (do we have all the instruments listed?)
o ORC documentation for the roots
o Populate target control racks with equipment
  + List of cables to-from target to rack
  + List of cables to-from control room (cables to be pulled through penetrations)
  + Plan for target rack(s) in the control room  (what goes where, power
requirements, etc)
  + ORC documentation for custom electronics in racks
o Cable tray installation (east side of shielding)
o Cable tray installation (west side of shielding)
o RF cooling loop plans (P&ID)
o Pneumatic system P&ID
o Electrical isolation of remaining target services
  (equivalent is a plan for earthing the system).