1. Make sure both Liquefiers are on "Idle" mode.
    See the QT HMI main screen (see Fig 1a). If QLHe100A and QLHe100B says "Idle" then both liquefiers are on idle mode. If any of those statuses are different from "Idle". Then navigate to the Liquefier's screen (Fig 1c).
    By touching the "Quantum technology" box (top-left of Fig 1a), and then touching the Liquefier name box (see Fig 1b).


                                                                          Fig (1a) 


                                                       Fig (1b)

    Then, Click on the "Idle" button on the top-left corner of Fig 1c.

                                                 Fig (1c)

  2.  Turn ON purifier LN2 heater by clicking/touching the "Heater MC Cycle" button (see Fig 2a). Check whether "VNVA" is open (it is normally kept open), if not open "VNVA".
    You will see that the bottom part of the purifier (in Fig 2a) becomes "orange" and "Heater MC Cycle" becomes "green".
    Wait until the level drops down to <2% and also TA_Top and TA_Bottom reads > 273 K.

                                                             Fig 2a  
    You can keep the heater ON without cycling by pressing both buttons (see Fig 3 below).

                                Fig 2b
    Don't for get to switch to the heater cycles if you are not watching frequently (eg: when you go to sleep, turn off the bottom one)

                                       Fig 2c
  3. Close v30 and v35 hand valves on HR3 (as shown in Fig 3) to isolate the helium space inside the purifier.

                                      Fig 3

  4. Close BV02 hand valve to isolate the Liquefiers (see Fig 4 bottom left 'yellow' hand valve).
    Note: The pressure inside the purifier gHe space maybe at very high pressure (~50 psi or higher: Check the reading on p10 on HR3 manifold).
     Therefore, before opening the v10a to start the first cycle of pumping, we want to make sure that we isolate the purifier and relieve the pressure down to ~1 psi (or slightly above the atmosphere).
  5. Slightly open the hand-valve called "Vvent" on the Helium supply manifold (see Fig 5), and listen to the sound generated by relieving gHe from that vent when you open "Vvent".
    When the relief sounds get low in volume, that indicates that the pressure inside the purifier gHe space is close to the atmosphere.
    (Note that, In the Fig 5, Vvent is fully open, and you don't need to fully open)

                             Fig 5

  6. Once v10a is opened, and heaters are ON, then let LN2 to boil-off while venting the contaminants through v10a.
     This will take about  8hrs to empty the LN2 but a bit longer for the TA_top and TA_bottom to reach 273K.

          Fig 6: This should be the configuration of v9a, v21a and v10a while pumping and purging, and ensure v30 and v35 hand valves are closed before pumping/purging.
     
  7. Install pumping and purging setup (see Fig 7a and 7b below). A gHe bottle, the pump (green), and a pressure gauge need to be connected with two separate hand valves to open/close pump and gHe-supply (to purge) independently. In this step, do not open any solenoid valves on the QT-HMI, just only install the setup and proceed to the next steps.
    Note: it would be better if you use an electronic pressure gauge (eg: MKS sensor with the readout) instead of the mechanical gauge because some mechanical gauges can measure max. pressure as 15 psi.
    Therefore, these lower/smaller ranged gauges can mislead us.

                                          Fig 7a                                                                                                                           Fig 7b                  


     
  8.  
  9.  Start (green) pump and open the hand valve connects to the pump to pump down while the heater on purifier LN2 is ON (see Figa 3a for the hand-valve (black) to the green pump).
  10.  Wait until the pressure on the gauge (pump-purge manifold: see Fig 3a) goes down to the lowest (usually it takes about 15-20 mins).
  11.  Close the black-hand-valve to the green pump (you don't have to turn off the power to the pump, just keep it running as you will pump again in this procedure).
  12.  Regulate the pressure of the gHe bottle ~3 psi and then open the blue-hand-valve (see Fig 3a) to purge the purifier gHe space.
  13.  Close the blue-hand-valve when the pressure gauge reads ~3 psi.
  14.  Open the black-hand-valve to start pumping down.
  15.  Repeat Steps 9 → 12 as many times as you wanted.
  16.  After done with the last cycle of pumping,  Close the black-hand-valve to the green pump.
  17.  Regulate the pressure of the gHe bottle ~3 psi and then open the blue-hand-valve (see Fig 3a) to purge the purifier gHe space.
  18.  Close v10a on QT-HMI screen (see Fig 6a).
  19.  Open v30 hand-valve slowly until it is fully opened (see Fig 4a), and watch the pressure on p10. It will go up to the outside tank pressure.
  20.  Check the pressures on p41 and p40 on the HR3 front. Both should read the same value.







































*****************************************************************************************************************************

*****************************************************************************************************************************

************************************** Please note that the information below are some previous notes *********************



  1.  Cleaning the QT purifier Helium-space from the top of the purifier Dewar when the both Liquefiers are on "Idle" mode

    a) Make sure both Liquefiers are in Idle mode.
    b) Make sure "VNVA" is open on purifier LN2 space, and then turn ON the heaters to vent all the LN2 as gN2.


    c)  Close V30 and keep V35 Open
    d)  Open SV01 in the QT HMI overview screen
    e) Close BV02 hand valve to isolate the Liquefiers
    f)  Connect a KF hose from the manifold (see the image below) to the port which connects to the GV02 yellow hand valve.
         
    g)  Open (a little bit) the 'vent' hand valve on that manifold and then open the black hand valve and yellow hand valve (GV02).
    h) Check the FMR reading (it will go up and slowly decrease as the gHe in the purifier flow through). Once the FMR shows around ~4slm (also on the QT HMI), then that indicates that the gHe from the purifier space is close to empty; and it's ready for pump, purge.
    i)  Close V30 and V35 on HR3 manifold.
       
    j) Connect the pump-purge-manifold with a pump, and gHe cylinder to the port on V10a.
    The above steps (c)  to ( i ) allow us to avoid the sudden pressure drop when opening the V10a. Otherwise
    Before connecting the pump, open V10a solenoid valve and vent the gHe inside the purifier space to the outside, and leave V10a open.


    k) Close the gHe (purge) hand-valve, and start the pump to pump down → Then close pump-hand-valve and purge the purifier Helium space with ~3psi by opening purge-hand-valve.

    l) Iterate step (e) several times.

    m) Turn OFF the purifier heaters.

    n)  Backfill the purifier Helium space with gHe (~6psi)

    o) Close V10a solenoid valve.

    p) Open V30 slowly, and then open V35.



2.  Cleaning QT purifier Helium-space from the top of the purifier Dewar (This needs to be done periodically because the purifier will be blocked by the contaminants from regular air)

a) Change the operation to "Manual" + "Run" mode, and close the SV01 and SV03 valves: also close the BV02 hand valve and REGX regulator on the liquefier manifold
   

b) Make sure to boil off and vent all the LN2 before the pumping-purging procedure. Use the heater if necessary (tap on the small bar located bottom of the purifier sign: orange color indicates that heater is ON).
   


c) Make sure to close the hand valves V30 (inlet to the purifier) and V35 (outlet from the purifier), and also the V21a on the QT PLC screen


d) ATTENTION!!!!
    Now, be careful that the purifier gHe space is pressurized ~90 psi. So we should relieve this pressure on the atmosphere before starting pumping

e) Open V10a to relieve the pressure


f) Connect the pump and a sensor (or a gauge) and start the pump


g) For purging/back-fill, Close V10a and open the V30 hand-valve gently to fill up to ~3 or ~4 psi.

h) Then close V30 and open V10a and start pumping.

i) Repeat steps (g) and (h)

j) After the last back-fill, close V10a and open V21a. Then, gently open the V30 hand valve and then V35.  → Purifier is ready!


IF you want to pump and back-fill using the same port (V10a) use the following steps).

c) Connect the pump to the outlet from V10a (currently we use the Edwards pump which is connected to the Helium recovery manifold pipe) with a pressure gauge, hand valve, and a Helium gas bottle (to backfill).
     Keep the V9a closed during pumping and purging.
   



  1.   Cleaning QT purifier Helium-space including the HR3 compressor lines up to the manifold

    1) Open V9a and V21a from PLC
       

    2) keep V30 hand valve closed
       

    3) Keep BV02 & RegX hand valves (going to/from liq A, B) closed
         

    4) Open SV01 and SV03 (Note: if the valves are not opening via PLC, then check whether the system is in Manual + Run mode, if not select that mode to open SV01 and SV03)
         
        

    5) Pump down using the setup that we just installed on the Vent.
         

    6) Opening hand valve V30 slowly increases the pump sound (takes a couple of seconds to respond due to the long path to reach the pump)
         See the above picture in step 2





------------------------------ AUX--------------

  1. Close V30 on the HR3 manifold (see Fig 4a).

                                                          Fig 4a

  2. Slightly open the hand-valve called "Vvent" on the Helium supply manifold (see Fig 5a), and listen to the sound generated by relieving gHe from that vent when you open "Vvent".
    When the relief sounds gets low in volume, that indicates that the pressure inside the purifier gHe space is close to the atmosphere.
    (Note that, In the Fig 5a, Vvent is fully open, and you don't need to fully open)

                                            Fig 5a
  3. While keeping the "Vvent" is partially opened, and with low gHe relief sound → Open v10a on QT HMI (see Fig 5a); and then close "Vvent" hand valve.
    Navigation steps:
    "Quantum technology" (See Fig 1a) > "Puirifier Overview" (see Fig 1b) > "QuantumPure He Overview" (see Fig 6a).

                                     Fig 6a