Here we organize the Operational Readiness Clearance (ORC) documents that needed to be submitted. Please "Click" on the title(s) to navigate to the dedicated page(s).


Target computer shutdown procedure: https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=7683 


FNAL ORC Submission pagehttps://fermipoint.fnal.gov/service/tsworc/SitePages/Home.aspx 


SystemORC #Description
Target LifterORC-1837Lifter assembly
Target LifterORC-1865Lifter control system
Target LifterORC-1866Lifter ADC system
Target LifterORC-1877Lifter Monitoring system
MicrowaveORC-1934Microwave motor controlling box 
Slow control rackORC-1895Overall rack ORC

ORC-1969E1039 Slow Control Rack Update in NM4 Hall
UVA-NMRORC-1854Custom components
UVA-NMRORC-1888Commercial Components
UVA-NMRORC-1888.01Addendum for operating from the cryo platform
Magnet Electronics (in-caveORC-2049Covers all the electronic connections on the magnet (in-cave)

Click Updates Page to see some updates on scheduling, constructions etc.

                     Manuals & Sample docs:


                        i) Electrical Safety ORC Review Guidelines
                           

                                

                       ii) Sample ORC Template ( eg: EIO)
                           




1) Microwave ORC (Waqar)


2) Microwave chiller-tube ORC (Anchit)


3) Target Lifter ADC system (Vibodha)


4) Target Lifter Control System (Vibodha)


5) NMR ORC (Ishara & Misha)


6) Roots pumps ORC (Anchit)


7) NMR-rack ORC (Ishara & Misha)


8) Cryo-rack ORC (Zulkaida & Ernesto)


9) Magnet ORC (rack and in-cave) (Zulkaida)


10) Slow-Controls Rack ORC (Zulkaida)