You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 150 Next »

New Page: https://github.com/uva-spin


GitHub pages:
https://github.com/UVA-LabVIEW-Projects/LabVIEW-Projects
https://github.com/E1039-Collaboration/e1039-target-controls

LabView Vi's & associated information


InstrumentHardware                            Vi   avail.GitHub location(s)                                                                                                                                          Assignment     Test StatusTested on target computer?Notes
1,2,3

Flow control (HFC) for magnet,

Flow control (HFC) for separator,

(Main) flow monitor (HFM) for fridge

THCD-400In-progress

Cryo Control Panel

Standalone: Temperature-Pressure-VIs/THCD_400_VIs


Kenichi

Misha         


Yes
4

Fridge nose level probe

AMI1700yes

Cryo Control Panel

Kenichi
Yes
5

Run valve


In-progress

Cryo Control Panel

Kenichi
Yes
6

Bypass valve


In-progressCryo Control PanelKenichi
Yes
7

High Accuracy Signal Conditioner: MKS 670B

For pressure sensor (MKS 690A)Step #2

Cryo Control Panel

Standalone: Temperature-Pressure-VIs/MKS_670_VIs

Kenichi

Zulkaida


Yes
8

Vacuum System Controller: MKS 946

For pressure sensor (MKS 722B) * 2Step #5

Cryo Control Panel

Standalone: Temperature-Pressure-VIs/MKS_946_VIs

Kenichi

Kenichi


Yes
9.1

DAQ for MCC E-TC for
annealing

Sensor: 

Type-T TC * 2

In-progressSame as #9.2Kenichi


9.2DAQ for Thermocouple: MCC E-TCSensor: Omega Type T, at target caveStep #5

https://github.com/uva-spin/Temperature-Pressure-VIs/tree/main/MCC_ETC_VIs

Kenichi


10

LakeShore218  (8 channels)


In-progress
Reggie


Yes
11

LakeShore218 (Target Insert)
2 + (6: can be used for other)


In-progress
Reggie
Yes
12

Target Lifter


In-progress
Vibodha


13

Basic Microwave motor controller
& potentiometer


In-progress
Vibodha


14

EIP Frequency counter


In-progress

https://github.com/uva-spin/e1039-target-controls/tree/master/Motor%20controller

Vibodha


15Magnet OVCPfeifer Vacuumyes
Zulkaida


18

Magnet PS


yeshttps://github.com/uva-spin/e1039-target-controls/tree/master/Magnet-PS-Control
Magnet Power Supply Operation
Zulkaida/David


19

Shim PS


yeshttps://github.com/uva-spin/e1039-target-controls/tree/master/Magnet-PS-Control
Magnet Power Supply Operation
Zulkaida/David


20Mercury iTM
yes
Misha


21

Mercury iTC

N2 levelyeshttps://github.com/uva-spin/e1039-target-controls/tree/master/Magnet-PS-ControlZulkaida


22

MaxiGauge

TPR 280 * 5yes

Cryo Control Panel

Standalone: Test-VIs/MaxiGaugeTesting

Kenichi

Zulkaida




23

EV105-N (Electronic valve)

Fairchite     TA6000-104

no (one Vi)
Zulkaida


24

EV102-N (Electronic valve)

Asco 8222G 002LT

no (one Vi)
Zulkaida


25

TE107-N (Temp. Sensor)

OmegaSA1 RTD

no (one Vi)
Zulkaida


26

TE108-N (Temp. Sensor)

OmegaSA1 RTD

no (one Vi)
Zulkaida


27

PT106-N (Pressure Sensor)

DWIER 626-11-GH-P1-E4-S1

no (one Vi)
Zulkaida


28

PT110-N (Pressure Sensor)

DWIER 626-11-GH-P1-E4-S1

no (one Vi)
Zulkaida


29TPG361Pfeiffer VacuumNeed testinghttps://github.com/uva-spin/Temperature-Pressure-VIs/tree/main/TPG361_Version2Zulkaida


Steps of VI Availability (Tentative)

  1. A few simple VIs for readout and configuration.  It is to confirm that the device can be controlled with LabVIEW.
  2. A complete set of VIs for readout and configuration.  Each VI should perform one function of the device.
  3. VIs for user interface. 
  4. VIs for continuous measurement.
  5. VIs for continuous logging.
  6. Note that an integrated user interface (like PDP) for all the devices that we use will be considered in a future.  We could use DQMH or CML DQMH.

Device List

Flow

Sensor DeviceNSensor LocationController DeviceController LocationFront EndNotes

TH HFC-303

2Magnet & Separator

THCD-400 #1

Slow-control rackCCP @ Target computer
TH HFM-3051FridgeTHCD-400 #1dittoCCP @ Target computer
???5roots LCW inflowArduinoMagnet rackTarget computerPhoto wanted.
???1NM4 LCW inflowACNETn/aTarget computer??Photo

Pressure

Note about installation:

  • The biggest issue is where to put MKS 690 1000 Torr. Ideally it should be close to the 100 Torr one
  • Please consult with Dustin to make sure about the final location
  • Sensor number 3 (He3) and 8 (Measuring LN2 reservoir) in the google docs and sheets above can not be installed not (waiting pipe/line installation). The rest could be installed
  • Sensors number 10 and 11 are LANL sensors. Please consult Misha to make sure which are the correct sensors since in the root, there are several other sensors from oerlikon
  • Please consult Ernesto for the current location of sensors and long cables
Item numberSensor DeviceNSensor LocationController DeviceController LocationFront EndNote
9

Pfeiffer PKR 361

1Attached to dewar

Pfeiffer TPG 361

Slow-control rackTarget computer
8MKS 722B #11Return manifoldMKS 946 #1, ch. 1Slow-control rackTarget computer
5MKS 722B #21Main return line, after roots pumpMKS 946 #1, ch. 2dittoditto
1MKS 690 #1 (100 Torr)1Fridge via flex hoseMKS 670 #1Slow-control rackTarget computer
2MKS 690 #2 (1000 Torr)1Neat MKS 690 100 TorrMKS 670 #2Slow-control rackTarget computer
3MKS 6151He3 pressure probeMKS 670 #3Slow-control rackTarget computer
6Pfeiffer TPR2801Separator return line, near return manifoldMaxigauge # 1, ch. 3Magnet RackTarget computerTo be replaced with APR250
7Pfeiffer TPR2801Magnet return line, near return manifoldMaxigauge # 1, ch. 4Magnet RackTarget computerTo be replaced with APR250
xPfeiffer APR2501Main return line, near return manifoldMaxigauge # 1, ch. 5Magnet RackTarget computerTo be replaced with another sensor
10Pfeiffer TPR2801Roots pump, LANLMaxigauge # 1, ch. 1Magnet RackTarget computer
11Pfeiffer TPR2801Roots pump, LANLMaxigauge # 1, ch. 2Magnet RackTarget computer


ItemLocationNotes
9

Already installed
8

Pipe fitting: KF-40

Sensor fitting: 4-VCR Female

Flex hose (needed because the gas port of the sensor must not be directed upward)

KF40 to KF16 converter : https://locoscience.com/products/kf40-to-kf16-flanges-vacuum-fitting-conical-reducer-adapter

KF16 flex hose: https://locoscience.com/products/kf16-flexible-vacuum-bellow-1000mm?_pos=1&_sid=63838aa66&_ss=r
KF16 to 4-VCR male : https://www.idealvac.com/Adapter-KF-16-to-4-VCR-Male/pp/P101374 



5

Pipe fitting: KF-16

Sensor fitting: 4-VCR Female

Adapter: KF-16 to 4-VCR Male

https://www.idealvac.com/Adapter-KF-16-to-4-VCR-Male/pp/P101374

Location: towards upside of the white piping (see the left image)

1 & 2

Pipe fitting:

1000Torr (~ $ 470)

KF16 to 1/2" swagelok
https://www.idealvac.com/Adapter-KF-16-to-12-in-Swagelok/pp/P102086
1/2" OD SS  ($ 270: 20ft)
1/2" to 1/4" reducer: https://products.swagelok.com/en/c/straights/p/SS-400-R-8
1/4" to 4-VCR connector : https://products.swagelok.com/en/c/straights/p/SS-4-VCR-6-400



3This is He Vapor pressure sensor (MKS 615)Waiting for piping
6 & 7



6) Separator line from cave should be connected to:   
    i) Pressure sensor (Need a Tee reducer KF25, KF16)
   ii) Mass Flow Controller (in and out are KF25)

Tee: https://locoscience.com/products/3-way-tee-kf25-flange-vacuum-fitting
Reducer to sensor: https://locoscience.com/products/kf25-to-kf16-flange-conical-reducer-vacuum-adapter

7) LHe vapor line from Magnet Dewar should be connected to:
   i) Pressure sensor: Need to identify the converter, need a Tee reducer KF25, KF16
 ii) Mass Flor Meter Controller

Adapter: https://locoscience.com/products/kf25-flange-to-1-npt-male-vacuum-fitting-adapter
Tee: https://locoscience.com/products/3-way-tee-kf25-flange-vacuum-fitting
Reducer to sensor: https://locoscience.com/products/kf25-to-kf16-flange-conical-reducer-vacuum-adapter

flex hose: https://www.amazon.com/ISO-KF-Corrugated-Bellow-Aluminum-Centering/dp/B09QGWGM2W (Qty 4)
MFC (this is KF25)
flex hose from MFC
Reducer KF40 to KF25
https://locoscience.com/products/kf40-kf25-flange-vacuum-fitting-reducer-adapter

Also, need a count of various converters we already have.
KF25-KF16, KF16-KF40, KF25-KF40



Fermilab Tech will help us install this one
10 & 11



LANL sensors. Check with Misha
4 (AUX)

MKS 722B (cylinder silver) seen in the photo has been moved to the roots pump area for #5.

TPR 280 will be place for #4 (AUX).  We need a longer cable.



Temperature


Sensor DeviceNSensor Location

Sensor

in place

Cable

in place

Controller DeviceController Location

Controller

in place

Front EndNotes
Vishay Chip 1K OHM8Inside of FridgeNoNot sureLakeShore 218 #1Slow-control rackYes?Target computer
6 Vishay Chip 1 K OHM + 2 cernox8Target InsertnoNot sureLakeShore 218 #2Slow-control rackYes?Target computer
Type-T TC8Magnet coilsYesYesMCC E-TC #1Slow-control rackYesTarget computer
Type-T TC3

LHe QT fill line (2 vacuum layer, 1 on stinger)

YesYesMCC E-TC #2Slow-control rackYesTarget computer
Type-T TC2Magnet IVCYesYesMCC E-TC #2dittodittoditto
Type-T TC1Separator lineYesYesMCC E-TC #2dittodittoditto
Type-T TC1Top seal of fridgeYesYesMCC E-TC #2dittodittoditto
Type-T TC2

Microwave cooling (1 on EIO, 1 on cooling water)

YesYesMCC E-TC #3Slow-control rackYesTarget computer
Type-T TC2

Fridge for Waqar's manual annealing system

YesYesMCC E-TC #3

ditto

dittoditto
Type-T TC2

Fridge for Henery's automated annealing system

NoNoArduino??

Annealing Panel

No??
Type-K TC10Surface of 10 cold headsYesYesLabJack U3-LVSlow-control rackYesTarget computer











Cryo Control Panel: CCP

  • Repository:  https://github.com/uva-spin/e1039-target-controls/tree/master/Cryo-Control
    • The latest version should be found in a development branch.
  • Conditions of devices & VIs expected for the FNAL review in early April?
    • Focus on the basic readouts and controls, given the time frame (10 days).
    • The expected condition of each device is proposed in the table below.
    • Functions not expected?
      • Automated control
      • Readout logging
      • Warning system
  • List of devices to be included

    ControllerSensorInterfaceController+sensor ready?Standalone VIs ready?VIs integrated into CCP?Condition for FNAL Review?
    THCD 4002 x HFC + HFMRS-232YesYesYes
    • Auto-read the three sensors at 1 Hz.
    • Change the set point of two HFCs manually.
    AMI 1700LHe4 level probeRS-232Yesn/aYes
    • Auto-read the He level at 1 Hz.
    Run valve

    Motor driver: AM ST5-S

    ADC: MCC USB-202

    RS-232

    USB

    Yes

    Yes

    n/aYes
    • Auto-read the motor position at 1 Hz.
    • Move the motor manually.
    Bypass valve

    Motor driver: AM ST5-S

    ADC: MCC USB-202

    RS-232

    USB

    Yes

    Yes

    n/aYes
    • Same as the run valve.
    MKS 670MKS 690 (100 Torr)GPIBYes+No (*2)n/aYes
    • Auto-read the sensor at 1 Hz (w/o sensor).
    MKS 670MKS 690 (1000 Torr)RS-232YesYesYes
    • Auto-read the sensor at 1 Hz.
    MKS 670MKS 615GPIBYes+No (*3)n/aYes
    • Auto-read the sensor at 1 Hz (w/o sensor).
    MKS 9462 x MKS 722RS-232YesYesYes
    • Auto-read the two sensors at 1 Hz.
    MaxiGauge5 x Pfeiffer Vacuum TPR 280RS-232?YesYesYes
    • Auto-read the five sensors at 1 Hz.
    • The readiness in the table considers the development of CCP, not the final configuration for the commissioning and data taking.
    • *2: A long cable is needed.  Waqar plans to make it soon.
    • *3: Where should we place MKS 615 (the blus box)?  The present cable from MKS 615 to the probe is of 1 m, which seems too short in terms of the radiation damage.  Longer cable are needed accordingly. 

Slow Control Rack + Magnet Rack Readiness Checklist:

This is table contain the status of the slow control rack and magnet rack: RackStatusApril2022.xlsx 

Some (Not all) priority:

  1. Test the VI for the Lakeshore
  2. Install remaining pressure sensors (See the table above about pressure sensor list)
  3. Install remaining Temperature sensors and readout (See the table above)
  4. Install the He and N2 Level probe connected to AMI1700
  5. Fixing the VI for MaxiGauge and Flow meter LCW
  6. Fix the Shim power supply relay
  7. Test the new AMI1700, the VI and the Voltage current converter box


Overall Computer+Program Configuration

This section is to discuss and share the overall configuration about computers and programs that we expect.  The required spec of each program might depend on this configuration.

Meeting Materials

DateTitle                                                                                                             Presenter               File                                                                                                                      

 

VIs for MCC E-TCKenichilabview_20210810.pdf

  

Update on LN2 BosVibodhaSCMeetig_August25.pptx

 


Zulkaida

 

Step count ADC length relationship

Vibodha

 

Updates on slow control rack and target computerKenichilabview_20210915.pdf

 

MKS 670 + PDP and LakeShore 218 + GPIBKenichilabview_20210922.pdf

 

VIs for MCC E-TCKenichilabview_20210929.pdf

 

VIs for MCC E-TCKenichilabview_20211013.pdf

 

Lifter Vi updateVibodha

 

MCC E-TC & Slow Control Data MonitorKenichilabview_20211103.pdf

 

Slow Control Data Monitor & MCC USB-202Kenichilabview_20211110.pdf

 

Slow Control Data Monitor & MCC E-TC with long TCKenichilabview_20211117.pdf

 

Some list about pressure sensorZulkaida

 

Slow Control Data Monitor, NMR Computer & MCC USB-202 with TCKenichilabview_20211124.pdf

 

NMR computer & MKS 615Kenichilabview_20211201.pdf

 

Lifter VIVibodha

 

Slow-Control System, NMR Computer & MKS 615Kenichilabview_20211208.pdf

 

Test of MKS 615 with LN2

Test of MCC E-TC + Long TC in LN2

Kenichi

Kenichi

labview_20211222.pdf

labview_20211218.pdf

 

TCP/IP communication of spill info, N of sweeps/measurement on PDPKenichislow_cont_20220119.pdf

 

PDP Readout TestKenichislow_cont_20220126.pdf

 

TCs for magnet coils and others; Rearrangement of KF connectionKenichislow_cont_20220216.pdf

 

Cryo Control PanelKenichislow_cont_20220302.pdf

 

TCs for magnet coils; Cryo Control PanelKenichi

slow_cont_20220309.pdf 

SC_Meeting_2022March9.pptx

 

Cryo Control PanelKenichi

slow_cont_20220316.pdf

 

Cryo Control PanelKenichi

slow_cont_20220323.pdf

 

Run+Bypass Valve in CCPKenichi

slow_cont_20220330.pdf

 

MKS670 and MaxiGauge in CCPKenichi

slow_cont_20220406.pdf

 

LCW flow meter, TC, CCPKenichi

slow_cont_20220420.pdf

 

Measurement of NMR noise level

Logging, Automated alarm

Kenichi

Kenichi

slow_cont_20220425_NMR.pdf

slow_cont_20220427.pdf

 

QT HMI

Kenichi

slow_cont_20220504_QT_HMI.pdf

 

QT HMI, Chart-axis control

Kenichi

slow_cont_20220511.pdf

 

TCs; Cables for MKS 615

Kenichi

slow_cont_20220525.pdf

 

Magnet PS Shim Relay

Kenichi

slow_cont_20220601.pdf

 

Logging of roots-pump PLC; Pressure-sensor locations

Kenichi

slow_cont_20220727_location.pdf





  • No labels