Monitor the fridge temperatures, IVC, flows (fridge, magnet, separator), magnet LHe level, etc.. the full system in general.
In order to look out for these parameters, use the following links:
- https://e906-gat1.fnal.gov/data-summary/e1039/target-par-preset/IVC_magnet_pressure.php
- https://e906-gat1.fnal.gov/data-summary/e1039/target-par-preset/fridge_temp_level.php
- https://e906-gat1.fnal.gov/data-summary/e1039/target-par-preset/return_flow.php
- Or more under https://e906-gat1.fnal.gov/data-summary/e1039/target-par-preset.php
Shift Schedule
As of 2022-12-22.
Time | 06:00-10:00 | 10:00-14:00 | 14:00-18:00 | 18:00-22:00 | 22:00-02:00 | 02:00-06:00 |
---|---|---|---|---|---|---|
Monitoring Person | Ishara | Vibodha | Ernesto | Farooq | Kenichi | Zulkaida |
On-Call Person | Vibodha and Farooq |
If anybody is going to shuffle the shift blocks, kindly inform the discord group in advance.
Non-Monitoring Tasks
The following tasks have to be done by onsite people.
As of 2022-12-22.
- Refill LHe to the fridge (up to Heat-Ex Top) and start the standby mode — At 06:00.
- Refill LHe to the fridge (up to level = 80%) — At 18:00.
- Refill Magnet space with LHe — At 19:00
- Refill LN2 to the Purifier & the shield — When the LN2 level becomes reasonably low.