List of equipment, utilities, staffing and services need from Fermilab for target running and setup:

 

Inside Cave:

8 plugs/extensions for 10A 110-120 VAC 60 Hz standard US

Safety setup: lights rope for ODH and Magnetic field

At least one single phase 220 V (with same specifications as below: this is a backup source)

Power source for actuator: not yet specified

Outside Cave:

500L liquid helium added to liquifier per month

20L liquid nitrogen for heat shield per day

3 He4-Gas K 2200psi (99.95%) bottles per week

Liquid nitrogen supply for material handling: 40L/week

Vent system for liquid nitrogen boil-off to go out of the cave

Deionized water (8 gallons + 1 gallon/week) for chillers used to cool the microwave generator

6 Clean power and conditioner/surge-protector for NMR all on one isolated circuit with same ground

15 plugs/extensions for 10A 110-120 VAC 60 Hz standard US outlets

Set of 3 phase 220 V for pump stack

At least two single phase 220 V for Magnet and Microwave Generator

  • Power Req: 200-240 V 50/60 Hz (prefer 208 V)
  • Power consumption max: 3.3 kVA

Needs for setting up internal network at FNAL for target slow controls, access through firewall

Staffing:

One technician with specialized training 2 hour every day or every-other day for target changing and loading as well as liquifier and cryogenic operations