List of equipment, utilities, staffing and services need from Fermilab for target running and setup:
Inside Cave:
at least 3 AC 110 V power outlets or extension cables for around the magnet area
Outside Cave:
Liquid Nitrogen supply for material handling
water for chillers
clean power and conditioner for NMR
Number of 110 V outlets
At least one 3 phase 220 V
At least one 1 phase 220 V
Whatever is needed for setting up internal network
Staffing:
One technician with specialized training 2 hour every other day (target changing and loading)