Turn-Off/On Procedure

Procedure for turning off and on the slow control rack, in case of planned/unplanned power outage.

Turning Off

  1. Make sure all programs about the slow controls (running on the target computer) are stopped.
  2. Record which devices are on (and off).
  3. Turn off all devices that have a mechanical power switch.
    1. This step might not be necessary since the power cords are unplugged in the next step and thus any surge current during a power outage recovery should not come in.  We need discuss to decide.
  4. Unplug the two power cords of the slow control rack.

Turning On

  1. Plug the two power cords of the slow control rack.
  2. Turn on all devices that have a mechanical power switch.
  3. Activate TPG 361 by pressing the "up" button for 5 seconds, until the pressure reading of channel 1 is shown.
  4. Wait until the pressure of TPG 361 goes below 1e-3 Torr. — Is the value correct??
  5. Activate DCU 600, by pressing the rightmost button. — Is the button correct??

Trouble Shooting

n/a

List of Devices

All readout devices are mounted on one of the following cabinet/racks or around them.  Lists of devices are managed in this page.

  • QT Cabinet
  • Slow-Control Rack
  • Magnet Rack

List of Software

  • Cryo Control Panel (CCP) at Target Computer
  • Polarization Display Panel (PDP) at NMR Computer
  • "read_roots_pump_PLC"
  • "collect-QT-HMI-csv.sh"

Repository

Monitoring Software

  • Data Summary Page
  • Target Passive Alarm