Collect all the information on each subsystem for the target group. Currently, we are aiming to have some kind of a complete draft on Aug 1, 2023.

  1. Target Operator (Old Page)
  2. Full System P&ID: https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=5834
  3. QT System Manual
  4. Magnet System Manual
  5. Fridge System Manual
  6. Target Lifter Manual
  7. UVA-NMR System Manual
  8. LANL NMR System Manual
  9. Microwave System Manual
  10. Roots-Pump System Manual
  11. Target-Insert Manual
  12. Target Materials Manual
  13. Annealing System Manual
  14. Device and Software for Readout and Control
  15. Cooldown Checklist
  16. Slow Cooldown Procedure
  17. What to do when there is a planned power outage?
  18. Target System Maintenance
  19. Spinquest Target System ORCs
  20. Useful Engineering Notes
  21. Magnet Slow cooldown plan
  22. DNP CH2 Target Polarization procedure
  23. TE Calibration with the SpinQuest Polarized Target System
  24. How to order LN2 refill to the tank, gHe tube-trailer, LN gHe cylinders, and LN2 portable Dewars at FNAL
  25. System Constants


Images and Graphics