The Confluence production environment will undergo a migration from 8am-5pm ET on Saturday, May 25th. The Confluence environment will be available in read only mode. Changes to data in Confluence will not be possible until the migration is complete.
...
Polarized Target Monitoring and Maintenance Guide https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=10182
How to connect to the Cryo-Control / QT Computer remotely?
Target_Maintenance_Guide_Revised_02-26-2023.pdf
How to request NM4 (EXP27) and Building 327 (A5BB2) key
Supplies Catalogue: Inventory list (at Counting room) [Supplies Catalog]
Target Shifts: Target Shifts
Target expert duties: Target Expert (https://confluence.its.virginia.edu/display/twist/Target+Expert)
Helium Piping repair log (if you are planning to do a work by opening the helium piping, then record the outside gHe tank pressure before and after the work on the following spreadsheet)
https://myuva.sharepoint.com/:x:/s/as-physics-poltar/EfdYaKMJA3FGsmSNWzykfmcBRhUEJn_L6lpUnbzwn97EyA?e=JOQh9o
How to order LN2 refill to the tank, gHe tube-trailer, LN gHe cylinders, and LN2 portable Dewars at FNAL
Zoom Links: Zoom Links
Registering a new device to Fermilab network: https://fermi.servicenowservices.com/kb_view.do?sysparm_article=KB0011206
...
Cables on East/West Penetrations: https://docs.google.com/spreadsheets/d/1KHIm25ZzsApTm0PRJM1kNqisLUiKE2Sznm1Y9u3YlbY
Cable_List_Dec2022.xlsx
SpinQuest Polarized Target System Manual
*** Set of Procedures on docdb and HAs (click)
- Fermilab Access & Trainings
Training Requiremets and Roles
- Pictures at NM4
UVA-NMR System at NM4
Target Lifter at NM4
Microwave System at NM4
Helium Liquefier (QT) System at NM4
- Insulation Vacuum Chamber (IVC)
Cooldown Phase 2023
- Magnet Rack
Magnet Power Supply
System at NM4Ramping Up / Down Procedure
Magnet Shim Power Supply
Roots-
PumpsPump System
at NM4Manual
- Fridge Sensors
Fridge Valve Control System at NM4
- Target-Insert Manual
- Target Materials Related Information
- Monitoring Layout in Control Room
Target Computer setup at NM4
- Slow Controls
Ongoing Tasks about Target Software
- Annealing System
- Gate Valve
Inventory list (at NM4 and UVA)
- IP addresses
- Sample HA :
View file name HA-QT-Coldheads.docx height 150 - Data Logs
- Polarized Target Maintenance & Monitoring Activities
- LN2 lines
Purchasing Information (by the SpinQuest Collaboration) (< Click)