Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Polarized Target Monitoring and Maintenance Guide https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=10182
How to connect to the Cryo-Control / QT Computer remotely?
Target_Maintenance_Guide_Revised_02-26-2023.pdf

How to request NM4 (EXP27) and Building 327 (A5BB2) key 

Supplies Catalogue: Inventory list (at Counting room) [Supplies Catalog] 

Target Shifts: Target Shifts
Target expert duties: Target Expert (https://confluence.its.virginia.edu/display/twist/Target+Expert)

Helium Piping repair log (if you are planning to do a work by opening the helium piping, then record the outside gHe tank pressure before and after the work on the following spreadsheet)
https://myuva.sharepoint.com/:x:/s/as-physics-poltar/EfdYaKMJA3FGsmSNWzykfmcBRhUEJn_L6lpUnbzwn97EyA?e=JOQh9o

How to order LN2 refill to the tank, gHe tube-trailer, LN gHe cylinders, and LN2 portable Dewars at FNAL

Zoom Links: Zoom Links 

Registering a new device to Fermilab network: https://fermi.servicenowservices.com/kb_view.do?sysparm_article=KB0011206

...


Cables on East/West Penetrations
: https://docs.google.com/spreadsheets/d/1KHIm25ZzsApTm0PRJM1kNqisLUiKE2Sznm1Y9u3YlbY
                                                              Cable_List_Dec2022.xlsx

SpinQuest Polarized Target System Manual

*** Set of Procedures on docdb and HAs (click)

  1. Fermilab Access & Trainings

    Training Requiremets and Roles

  2.  Pictures at NM4
  3. UVA-NMR System at NM4

  4. Target Lifter at NM4

  5. Microwave System at NM4

  6. Helium Liquefier (QT) System at NM4

  7. Insulation Vacuum Chamber (IVC)
  8. Cooldown Phase 2023

  9. Magnet Rack
  10. Magnet Power Supply

    System at NM4

    Ramping Up / Down Procedure

  11. Magnet Shim Power Supply

  12. Roots-

    Pumps

    Pump System

    at NM4

    Manual

  13. Fridge Sensors
  14. Fridge Valve Control System at NM4

  15. Target-Insert Manual
  16. Target Materials Related Information
  17. Monitoring Layout in Control Room
  18. Target Computer setup at NM4

  19. Slow Controls

    Ongoing Tasks about Target Software

  20.  Annealing System
  21.  Gate Valve
  22. Inventory list (at NM4 and UVA)

  23. IP addresses
  24. Sample HA :
     
    View file
    nameHA-QT-Coldheads.docx
    height150


  25. Data Logs
  26. Polarized Target Maintenance & Monitoring Activities
  27. LN2 lines




    Purchasing Information (by the SpinQuest Collaboration) (< Click)