You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 25 Next »

Use this .docx file (download and edit) to collect data during the fill: Magnet_LHe_Fill_Checklist.docx

Condition

Procedure

Note: Select the Dewar that you are going to use to fill (Liq should contain at least 200 L of Helium), and then change Dewar Set pressure to 5.7 psi at least 3 hours before the fill.

  1. Ensure the Liquefier is in "Auto +Idle" mode (it may be already on "Auto + Idle" mode), if not, then change the mode of Liq to Auto + Idle.
  2. Download Magnet_LHe_Fill_Checklist.docx file and fill all the "initial parameters" and get ready to fill the rest of the fields during the fill.
  3. Start to cool down the transfer line by opening VJVA/B (ensure VPC is already opened). This is the start time of the transfer.
    1.   Record the time, the magnet level and the Liq level.
  4. Wait for 4 mins. You will observe TX1 start to decrease (with a small spike at the beginning), then it will reach below 100K.
    Meanwhile, ensure the mode of the other liquefier is on  "Auto+Idle". If not, set it to "Aut+Idle" mode. **
  5. After waiting 4 minutes, disable the auto control of the MagRetBypass valve, using "MagRetBypass_Main.vi" in CCP.
  6. Open the MagRetBypass valve fully.
  7. Open VJVT and close VPC.
  8. Change the mode of Liq to Manual + Idle.
  9. Close SVNA/B (outlet valve).
  10. Open SV501A/B (inlet valve).
  11. Set FC501A/B at 50 SLM.
  12. Turn off all the five cold heads of Liq. 
  13. Turn on all the five heaters of Liq.
  14. Wait until the pressure differential (between Liq & Mag) becomes 4.0 psi. Do not let the Delivery Dewar Pressure go above 9 psig. (adjust FC501A/B as needed based on the pressure difference).
    1. Usually the magnet pressure (PTMR3) goes up to 2.0 psi and then down slowly to 1.5 psi.
    2. If the pressure differential doesn't increase, you need a countermeasure to increase it, or stop the filling.
  15. Turn off the heaters of Liq.  If the pressure differential starts decreasing, turn them on for now and turn off in the next step instead of lowering FC501A/B.
  16. Maintain the pressure differential at 4.0-4.5 psi, by adjusting FC501A/B.
    1. Usually you change FC501A/B with a step of 5 SLM down to 40 SLM (i.e. 55 → 50 → 45 → 40 SLM).
    2. You have to increase FC501A/B when the pressure differential becomes smaller than 4.0 psi.
  17. Keep until the magnet level reaches 40% (135 L).
  18. Close VJVA/B.  Open VPC.  Close VJVT.
    1. This is the end time of the transfer.  Record the time, the magnet level and the Liq level.
  19. Enable the auto control of the MagRetBypass valve.  Change the set point to 1.5 psi if needed.
  20. Change the Liq settings as follows:
    1. The pressure set point is the original value that was set before you started this procedure.
    2. The outlet flow is 40 SLM.
    3. The Liq mode is Auto + Liquefy.
    4. If you change the mode of the other liquefier in step6, change it back to Liquefy.
  21. Wait until the inlet flow (FC501 A/B I) becomes 60 SLM (i.e. max).
  22. Calculate the transfer efficiency using this page  https://e906-gat1.fnal.gov/data-summary/e1039/target-par-preset/target-LHe-transfer-eff.php
  23. Lower the outlet flow to 30 SLM and wait until the inlet flow becomes 60 SLM.  If the Liq pressure goes up, increase the outlet flow and wait until the pressure goes down.
  24. Repeat step 24 with outlet flow = 20, 10 and 2 SLM.
  25. Confirm that the Liq pressure stays around the set point.


**It is to raise PT501A/B so that the inflow to Liq can reach the maximum (60 SLM).  You might skip this step if you are sure that PT501A/B will be high enough without this step.

Note

  • Steps 22-26 are rather complicated because the liquefier becomes warm after this procedure.  We have to keep the inlet+outlet flow high until the liuqefier becomes cold enough to liquefy.  You might try to find a simpler way to replace these steps.

Previous Version (Until 2023-01-01)

  1. Select a QT dewar for the magnet filling. The dewar should contain at least 200L Helium
  2. Bing the dewar pressure to around 3.5-4 psi by setting the liquefier to Manual+Idle and setting outlet flow to 60 SLM.  This will take around 1 hour (for 6.5 psi to 3.5 psi)
  3. Start to cool down the transfer line by opening VPC and VJVA/B.  Monitor TX1 and wait until it reaches below 100K.
  4. When it is ready, start the transfer to the magnet by following the  sequence 
    1. Fully close the magnet return bypass valve
    2. Open VJVT
    3. Close VPC
    4. Fully Open the magnet return bypass valve
  5. Pserize the dewar by opening SVPA/B to maintain a 3 psi pressure difference between the magnet
  6. monitor the magnet helium level
  7. Stop the transfer when the magnet helium level reaches 40%
    1. Close VJVA/B
    2. Open VPC
    3. Close VJVT
    4. Set the magnet return bypass valve to 1.5 Pid control
  • No labels