Step #DescriptionNotes / Reasons
1

Make sure to have both Liquefiers either on
"Run + Auto + Idle" or
"Run + Manual + Idle"
or

Ensure the solenoid valves V9a and V21a are open. 

2

Close BV02
Image

This is to isolate both Liquefiers from the purifier

3

Close V30 hand valve on HR3
Image

Closing the inlet to the purifier
Note: At this time purifier helium space's pressure would be same as the tank pressure
4

Open SV01 on QT-HMI main manifold

This is to open the path from the outlet of the purifier to the Vvent
5

Crack open Vvent while someone watching P40 pressure gauge on HR3 front panel
ImageImage

This is to bring down the pressure inside the purifier as a preparation to open V10a.
Bring the P40 down as much as you can (preferred below 10 psig). If it doesn't go down, it is because cold gHe is expanding. In that case leave the Vven cracked open.

6Open V10a on QT-HMI screen
(Navigate to Purifier Overview → He Overview)
This will make a noise because a sudden relieving the pressure in the purifier helium space via V10a.
7Close Vvent hand valve
8Close V35 hand valve

Now the purifier helium space is isolated from the rest of the system and opened to the atmosphere via V10a

9Write down the LN2 level in the purifier on the records sheetFind this binder on the HR3 top
10Ensure VNVA is open, and then Turn ON the purifier heaters
Click on both "Heater MC Cycle" and "Heater MC Stop at SP"

This will take about ~8hrs to empty a full purifier, and further it will take about ~24 hrs for "TA_Top and TA_Bot" temperatures to reach > 274K
 See T1A and T2A parameters on the strip charts.

11Once TA_Top and TA_Bot temperatures reach > 274K
Access the hall and connect the pump/purge setup (small manifold with pump, gHe cylinder, pressure gauge, and hand valves) to the V10a outlet port.

12Start (green) pump and open the hand valve connected to the pump to pump down while the heater on purifier LN2 is ON
13Wait until the pressure on the gauge reaches the lowest (usually it takes about 15-20 mins).
14Close the black-hand-valve to the green pump
15Regulate the pressure of the gHe bottle ~3 psi and then open the blue-hand-valve to purge the purifier gHe space.
16Close the blue-hand-valve when the pressure gauge reads ~3 psi.
17Open the black-hand-valve to start pumping down.
18Repeat Steps 13 → 17 as many times as you want. Or leave it pumping over night with the heaters ON3 days of pumping down (or more) would be recommended for a thorough cleaning
19After being done with the last cycle of pumping,  Close the black-hand-valve to the green pump.
20Regulate the pressure of the gHe bottle ~3 psi and then open the blue-hand-valve to purge the purifier gHe space.
21Close v10a on QT-HMI screen
22Open V30 hand-valve slowly until it is fully opened 
23Open v35 hand-valve slowly until it is fully opened Once you open V35, the line up to BV02 and Vvent will be pressurized. 
24

Check the pressures on p41 and p40 on the HR3 front. Both should read the same value. If it does not read the same value, then proceed again with Step 1, otherwise proceed to the next step.


25Detach the pump/purge manifold if you are not going to perform purifier regeneration again soon.
26Ensure SV01 is openThis is to bleed gHe to ensure the atmosphere is not trapped in the piping section up to BV02
27Crack open Vvent and flush/bleed gHe through Vvent for a few secondsYou can open and close that Vvent valve to pressure purge
28Close Vvent hand valve
29Fill the purifier using the warm purifier up to 90% filling procedureNote: During this process, purifier can go to the Alarm mode. If it does so, reduce the pressure in the purifer and clear the Alarm on "Purifier Alarm Page" and open V9a and V21a valves (these valves will be closed when purifier goes to the Alarm mode)
30Once the purifier is filled with LN2 up to 90% level, then ensure V9a and V21a are opened
31Perform the steps 26 and 27 again to clean the line with purifier gHe
32Close SV01
33Open SVSAMPLE followed by the green pressure regulator and the flow-meter to have a flow to the purity meter and ensure you can read 100% or slightly above.Also use the portable purity meter setup to confirm the purity with PM01.
There is a port you can connect the portable purity meter to the QT-HMI cabinet which is the same line as to PM01. So, just open SVSAMPLE + green hand valve + flow-meter (as same as for PM01)
34Close SVSAMPLEYou can leave the green-hand valve and flow-meter opened so you can remotely open SVSAMPLE at anytim to measure the purity of the purified helium from the purifier
35Open BV02 hand-valve slowly until it is fully opened Now purifier regeneration is comple.
Don't forget to write down the date,time, cycles on the binder sheets for maintenance