You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 35 Next »

For more information: SpinQuest Polarized Target

UVA-PTGroup-elog: http://twist.phys.virginia.edu:8081


How to connect to the Cryo-Control / QT Computer remotely?

For Windows OS: VNC Viewer on Windows Platform.docx
For Ubuntu / Mac OS: (on command line: make sure you installed Kerberos on your computer, also you will need an account for e1039gat1: please contact Kun Liu to create one)
                                    kinit -f <YOUR_USER_NAME>@FNAL.GOV
                                > for QT computer:
                                    ssh -N -L 9999:192.168.24.199:5900 <YOUR_USER_NAME_ON_E1039_GAT1>@e1039gat1.fnal.gov
                                > for Cryo computer:
                                    ssh -N -L 9998:192.168.24.17:5900 <YOUR_USER_NAME_ON_E1039_GAT1>@e1039gat1.fnal.gov

Link to Strip Charts: https://e906-gat1.fnal.gov/data-summary/e1039/

*** Alarms ***

---------------------------------------------------------------------
See this page for the monitoring schedule → Target Monitoring Shifts
---------------------------------------------------------------------

Link to backups (ordering purposes):
https://docs.google.com/spreadsheets/d/19thuGkqpo8E5ur69jbFGEyx7AEm2zlVy-kkL3J7mimk/edit?usp=sharing
https://myuva.sharepoint.com/:x:/r/sites/as-physics-poltar/_layouts/15/Doc.aspx?sourcedoc=%7B07A8CC14-6C8A-4236-8B66-5A6122FB691E%7D&file=PTGroup_Purchasing.xlsx&action=default&mobileredirect=true


Cables on East/West Penetrations
: https://docs.google.com/spreadsheets/d/1KHIm25ZzsApTm0PRJM1kNqisLUiKE2Sznm1Y9u3YlbY
                                                              Cable_List_Dec2022.xlsx


*** Set of Procedures on docdb and HAs (click)

  1. Fermilab Access & Trainings

  2.  Pictures at NM4
  3. UVA-NMR System at NM4

  4. Target Lifter at NM4

  5. Microwave System at NM4

  6. Helium Liquefier (QT) System at NM4

  7. Magnet Rack
  8. Magnet Power Supply System at NM4

  9. Magnet Shim Power Supply

  10. Roots-Pumps System at NM4

  11. Fridge Sensors
  12. Fridge Valve Control System at NM4

  13. Target Insert
  14. Target Materials Related Information
  15. Monitoring Layout in Control Room
  16. Target Computer setup at NM4

  17. Slow Controls

  18.  Annealing System
  19.  Gate Valve
  20. Inventory list (at NM4 and UVA)

  21. IP addresses
  22. Sample HA :
     


  23. Data Logs
  24. Polarized Target Maintenance & Monitoring Activities
  25. LN2 lines
  • No labels