You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 43 Next »

For more information: SpinQuest Polarized Target

UVA-PTGroup-elog: http://twist.phys.virginia.edu:8081

Polarized Target Monitoring and Maintenance Guide https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=10182
How to connect to the Cryo-Control / QT Computer remotely?
Target_Maintenance_Guide_Revised_02-26-2023.pdf

Zoom Links: Zoom Links 

Registering a new device to Fermilab network: https://fermi.servicenowservices.com/kb_view.do?sysparm_article=KB0011206


For Windows OS: VNC Viewer on Windows Platform.docx
For Ubuntu / Mac OS: (on command line: make sure you installed Kerberos on your computer, also you will need an account for e1039gat1: please contact Kun Liu to create one)
                                    kinit -f <YOUR_USER_NAME>@FNAL.GOV
                                > for QT computer:
                                    ssh -N -L 9999:192.168.24.199:5900 <YOUR_USER_NAME_ON_E1039_GAT1>@e1039gat1.fnal.gov
                                > for Cryo computer:
                                    ssh -N -L 9998:192.168.24.17:5900 <YOUR_USER_NAME_ON_E1039_GAT1>@e1039gat1.fnal.gov

For Ubuntu: Follow the steps as mentioned in the document: Usage of Remote Access on UBuntu.docx 

Link to Strip Charts: https://e906-gat1.fnal.gov/data-summary/e1039/

*** Alarms ***

---------------------------------------------------------------------
See this page for the monitoring schedule → Target Monitoring Shifts
---------------------------------------------------------------------

Link to backups (ordering purposes):
https://docs.google.com/spreadsheets/d/19thuGkqpo8E5ur69jbFGEyx7AEm2zlVy-kkL3J7mimk/edit?usp=sharing
https://myuva.sharepoint.com/:x:/r/sites/as-physics-poltar/_layouts/15/Doc.aspx?sourcedoc=%7B07A8CC14-6C8A-4236-8B66-5A6122FB691E%7D&file=PTGroup_Purchasing.xlsx&action=default&mobileredirect=true


Cables on East/West Penetrations
: https://docs.google.com/spreadsheets/d/1KHIm25ZzsApTm0PRJM1kNqisLUiKE2Sznm1Y9u3YlbY
                                                              Cable_List_Dec2022.xlsx


*** Set of Procedures on docdb and HAs (click)

  1. Fermilab Access & Trainings

  2.  Pictures at NM4
  3. UVA-NMR System at NM4

  4. Target Lifter at NM4

  5. Microwave System at NM4

  6. Helium Liquefier (QT) System at NM4

  7. Insulation Vacuum Chamber (IVC)
  8. Magnet Rack
  9. Magnet Power Supply System at NM4

  10. Magnet Shim Power Supply

  11. Roots-Pumps System at NM4

  12. Fridge Sensors
  13. Fridge Valve Control System at NM4

  14. Target Insert
  15. Target Materials Related Information
  16. Monitoring Layout in Control Room
  17. Target Computer setup at NM4

  18. Slow Controls

  19.  Annealing System
  20.  Gate Valve
  21. Inventory list (at NM4 and UVA)

  22. IP addresses
  23. Sample HA :
     


  24. Data Logs
  25. Polarized Target Maintenance & Monitoring Activities
  26. LN2 lines
  • No labels